South & Central America Data Center Construction Market Forecast to 2030

South & Central America Data Center Construction Market Forecast to 2030 – Regional Analysis – by Types of Construction (General Construction, Electrical Design, and Mechanical Design), Tier Standards (Tier 1 & Tier 2, Tier 3, and Tier 4), and Industry Verticals (BFSI, Government, Education, Manufacturing, Retail, Transportation, Media & Entertainment, and Others)

Send Enquiry

$2,485$3,885

Description

The South & Central America data center construction market was valued at US$ 10,262.76 million in 2022 and is expected to reach US$ 15,348.88 million by 2030; it is estimated to register at a CAGR of 5.2% from 2022 to 2030.

Rapid Expansion of IOT Services Fuels South & Central America Data Center Construction Market

The IoT has transformed data centers in recent years due to a surge in the adoption of IoT and IoT devices such as lightbulbs, cellphones, and webcams. With the rise in the number of IoT devices, the reliance on data centers to appropriately store, process, and analyze data is also growing. In addition, as more and more devices connect to the internet through IoT, they generate massive amounts of data. These devices include sensors in smart homes, wearables, industrial equipment, and connected cars, among others. The type of data generated by these devices is becoming increasingly diverse and complex. It includes location data, environmental data, usage data, and even real-time video streams. Further, analytics and processes are critical components in a company’s digital transformation. Analytics and processes provide an avenue for data centers to expand their activities in terms of their operations. Their distinct digitization processes will include IoT deployment in operations, capacity building, business development, infrastructure, and system utilization. As more devices connect and generate massive data, the need for efficient and scalable data center infrastructure also increases. Thus, the expansion of IoT services fuels the South & Central America data center construction market growth.

South & Central America Data Center Construction Market Overview

The growth of the data center construction market in South America is largely driven by rapid technological advancements, owing to the remarkable growth of smartphones and the day-to-day streaming of big data. The region accounts for approximately 80% of the urban population residing in cities that have registered massive adoptions of social media. A few of the key provinces of the region have ubiquitous technology, and this has resulted in transformed expectations by the digitally smart citizens of the region. Further, the region faces challenges with building suitable data centers, which sometimes incurs larger CapEx & OpEx. However, the rapid development of IT infrastructure in Brazil is expected to fuel the data center construction market in SAM.

In May 2023, Scala Data Centers announced the startup of the 6MW IT SGRUTB05 data center, the second-largest vertical data center in South America. A few of the major key players in this region include Flexenclosure AB, AcetoTI, and SmartCube. Additionally, the growth of the South & Central America data center construction market in South America is largely driven by fast-paced technological advancements, owing to the remarkable growth of smartphones and the day-to-day streaming of big data. The region accounts for approximately 80% of the urban population residing in cities that have registered massive adoptions of social media. A few of the key provinces of the region have ubiquitous technology, and this has resulted in expected transformations by the digitally smart technologies of the region. Further, the region faces challenges with building suitable data centers, which sometimes incurs larger CapEx & OpEx. However, the rapid development of IT infrastructure in Brazil is expected to fuel the South & Central America data center construction market in SAM.

South & Central America Data Center Construction Market Revenue and Forecast to 2030 (US$ Million)

South & Central America Data Center Construction Market Segmentation

The South & Central America data center construction market is segmented based on types of construction, tier standards, industry verticals, and country.

Based on types of construction, the South & Central America data center construction market is segmented into general construction, electrical design, and mechanical design. The electrical design segment held the largest share in 2022.

In terms of tier standards, the South & Central America data center construction market is segmented into tier 1 & tier 2, tier 3, and tier 4. The tier 3 segment held the largest share in 2022.

By industry verticals, the South & Central America data center construction market is segmented into IT & telecommunication, BFSI, government, education, manufacturing, retail, transportation, media & entertainment, and others. The IT & telecommunication segment held the largest share in 2022.

Based on country, the South & Central America data center construction market is categorized into Brazil, Argentina, and the Rest of South & Central America. Brazil dominated the South & Central America data center construction market in 2022.

Rittal GmbH & Co KG, Schneider Electric SE, DPR Construction Inc, AECOM, Turner Construction Co, and Eaton Corp Plc are some of the leading companies operating in the South & Central America data center construction market.

Summary Info

Industry:

Pricing options:

, ,

Geographical coverage:

,

Year of Publication:

At 5.2% CAGR, South & Central America Data Center Construction Market is Speculated to be Worth US$ 15,348.88 Million by 2030, says Business Market Insights

According to Business Market Insights’ research, the South & Central America data center construction market was valued at US$ 10,262.76 million in 2022 and is expected to reach US$ 15,348.88 million by 2030, registering a CAGR of 5.2% from 2022 to 2030. Growing construction of tier 4 data centers and increasing adoption of green data centers are among the critical factors attributed to the South & Central America data center construction market expansion.

A Tier 4 data center is the highest certification in the Uptime Institute’s system of segmenting data center performance into four tiers. This tier accounts for an expected uptime of 99.995% per year. Tier 4 data centers provide the highest level of uptime and fault tolerance, making them ideal for mission-critical applications such as financial services, healthcare, and telecommunications. As these sectors grow and digitalization continues, the demand for Tier 4 facilities rises, which boosts the number of new construction projects.

Additionally, Tier 4 data centers command premium pricing compared to lower tiers due to their advanced infrastructure and stringent operational requirements. This leads to higher profits for construction companies and data center operators, attracting significant investment for construction of new data centers. The construction of Tier 4 data centers requires expertise from various industries, including electrical and mechanical engineering, construction materials, and specialized IT equipment. This stimulates growth in these related industries, creating additional employment opportunities and economic benefits. The growing construction of Tier 4 data centers is expected to present a promising opportunity for the South & Central America data center construction market growth during the forecast period.

On the contrary, complexities in data center infrastructure and its establishment hamper the growth of South & Central America data center construction market.

Based on types of construction, the South & Central America data center construction market is segmented into general construction, electrical design, and mechanical design. The electrical design segment held 45.6% share of the South & Central America data center construction market in 2022, amassing US$ 4,679.88 million. It is projected to garner US$ 7,648.38 million by 2030 to expand at 6.3% CAGR during 2022-2030.

In terms of tier standards, the South & Central America data center construction market is segmented into tier 1 & tier 2, tier 3, and tier 4. The tier 3 segment held 49.9% share of the South & Central America data center construction market in 2022, amassing US$ 5,120.53 million. It is estimated to garner US$ 7,440.15 million by 2030 to expand at 4.8% CAGR during 2022-2030.

By industry verticals, the South & Central America data center construction market is segmented into IT & telecommunication, BFSI, government, education, manufacturing, retail, transportation, media & entertainment, and others. The IT & telecommunication segment held 28.8% share of South & Central America data center construction market in 2022, amassing US$ 2,953.95 million. It is predicted to garner US$ 4,887.97 million by 2030 to expand at 6.5% CAGR during 2022-2030.

Based on country, the South & Central America data center construction market is categorized into Brazil, Argentina, and the Rest of South & Central America. Brazil held 46.5% share of South & Central America data center construction market in 2022, amassing US$ 4,774.24 million. It is projected to garner US$ 7,663.90 million by 2030 to expand at 6.1% CAGR during 2022-2030.

Key players operating in the South & Central America data center construction market are Rittal GmbH & Co KG, Schneider Electric SE, DPR Construction Inc, AECOM, Turner Construction Co, and Eaton Corp Plc, among others.

o Save and reduce time carrying out entry-level research by identifying the growth, size, leading players, and segments in the South & Central America data center construction market.
o Highlights key business priorities in order to assist companies to realign their business strategies.
o The key findings and recommendations highlight crucial progressive industry trends in South & Central America data center construction market, thereby allowing players across the value chain to develop effective long-term strategies.
o Develop/modify business expansion plans by using substantial growth offering developed and emerging markets.
o Scrutinize in-depth South & Central America market trends and outlook coupled with the factors driving the market, as well as those hindering it.
o Enhance the decision-making process by understanding the strategies that underpin security interest with respect to client products, segmentation, pricing, and distribution.
TABLE OF CONTENTS

1. Introduction
1.1 The Research Team Research Report Guidance
1.2 Market Segmentation
2. Executive Summary
2.1 Key Insights
2.2 Market Attractiveness
3. Research Methodology
3.1 Coverage
3.2 Secondary Research
3.3 Primary Research
4. South & Central America Data Center Construction Market Landscape
4.1 Overview
4.2 Ecosystem Analysis
4.2.1 List of Vendors in the Value Chain
5. South & Central America Data Center Construction Market – Key Market Dynamics
5.1 South & Central America Data Center Construction Market – Key Market Dynamics
5.1.1 Rise in Launch of New Edge Data Centers
5.1.2 Rapid Expansion of IoT Services
5.1.3 Surge in Data Center Construction Activities
5.2 Market Restraints
5.2.1 Rise in Cost of Infrastructure Development
5.2.2 Complexities in Data Center Infrastructure and its Establishment
5.3 Market Opportunities
5.3.1 Increasing Implementation of Hyperscalers and Colocation
5.3.2 Growing Construction of Tier 4 Data Centers
5.4 Future Trends
5.4.1 Increasing Adoption of Green Data Centers
5.5 Impact of Drivers and Restraints:
6. Data Center Construction Market – South & Central America Market Analysis
6.1 South & Central America Data Center Construction Market Revenue (US$ Million), 2022-2030
6.2 South & Central America Data Center Construction Market Forecast Analysis
7. South & Central America Data Center Construction Market Analysis – by Type of Construction
7.1 Electrical Construction
7.1.1 Overview
7.1.2 Electrical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
7.2 General Construction
7.2.1 Overview
7.2.2 General Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
7.3 Mechanical Construction
7.3.1 Overview
7.3.2 Mechanical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
8. South & Central America Data Center Construction Market Analysis – by Tier Standard
8.1 Tier 3
8.1.1 Overview
8.1.2 Tier 3: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
8.2 Tier 4
8.2.1 Overview
8.2.2 Tier 4: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
8.3 Tier 1 and Tier 2
8.3.1 Overview
8.3.2 Tier 1 and Tier 2: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9. South & Central America Data Center Construction Market Analysis – by Industry Vertical
9.1 IT and telecommunication
9.1.1 Overview
9.1.2 IT and telecommunication: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.2 BFSI
9.2.1 Overview
9.2.2 BFSI: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.3 Media and Entertainment
9.3.1 Overview
9.3.2 Media and Entertainment: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.4 Retail
9.4.1 Overview
9.4.2 Retail: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.5 Manufacturing
9.5.1 Overview
9.5.2 Manufacturing: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.6 Government
9.6.1 Overview
9.6.2 Government: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.7 Transportation
9.7.1 Overview
9.7.2 Transportation: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.8 Others
9.8.1 Overview
9.8.2 Others: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10. South & Central America Data Center Construction Market -Country Analysis
10.1 South & Central America
10.1.1 South & Central America: Data Center Construction Market – Revenue and Forecast to 2030 (US$
10.1.2 South & Central America: Data Center Construction Market – Revenue and Forecast Analysis – by Country
10.1.2.1 South & Central America: Data Center Construction Market – Revenue and Forecast Analysis – by Country
10.1.2.2 Brazil: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.2.2.1 Brazil: Data Center Construction Market Breakdown, by Type Of Construction
10.1.2.2.2 Brazil: Data Center Construction Market Breakdown, by Tier Standard
10.1.2.2.3 Brazil: Data Center Construction Market Breakdown, by Industry Vertical
10.1.2.3 Argentina: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.2.3.1 Argentina: Data Center Construction Market Breakdown, by Type Of Construction
10.1.2.3.2 Argentina: Data Center Construction Market Breakdown, by Tier Standard
10.1.2.3.3 Argentina: Data Center Construction Market Breakdown, by Industry Vertical
10.1.2.4 Rest of South & Central America: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.2.4.1 Rest of South & Central America: Data Center Construction Market Breakdown, by Type Of Construction
10.1.2.4.2 Rest of South & Central America: Data Center Construction Market Breakdown, by Tier Standard
10.1.2.4.3 Rest of South & Central America: Data Center Construction Market Breakdown, by Industry Vertical
11. Competitive Landscape
11.1 Heat Map Analysis by Key Players
11.2 Company Positioning & Concentration
12. Industry Landscape
12.1 Overview
12.2 Market Initiative
13. Company Profiles
13.1 Rittal GmbH & Co KG
13.1.1 Key Facts
13.1.2 Business Description
13.1.3 Products and Services
13.1.4 Financial Overview
13.1.5 SWOT Analysis
13.1.6 Key Developments
13.2 DPR Construction Inc
13.2.1 Key Facts
13.2.2 Business Description
13.2.3 Products and Services
13.2.4 Financial Overview
13.2.5 SWOT Analysis
13.2.6 Key Developments
13.3 Schneider Electric SE
13.3.1 Key Facts
13.3.2 Business Description
13.3.3 Products and Services
13.3.4 Financial Overview
13.3.5 SWOT Analysis
13.3.6 Key Developments
13.4 AECOM
13.4.1 Key Facts
13.4.2 Business Description
13.4.3 Products and Services
13.4.4 Financial Overview
13.4.5 SWOT Analysis
13.4.6 Key Developments
13.5 Turner Construction Co
13.5.1 Key Facts
13.5.2 Business Description
13.5.3 Products and Services
13.5.4 Financial Overview
13.5.5 SWOT Analysis
13.5.6 Key Developments
13.6 Eaton Corp Plc
13.6.1 Key Facts
13.6.2 Business Description
13.6.3 Products and Services
13.6.4 Financial Overview
13.6.5 SWOT Analysis
13.6.6 Key Developments
14. Appendix
14.1 About The Research Team

LIST OF TABLES

Table 1. South & Central America Data Center Construction Market Segmentation
Table 2. List of Vendors
Table 3. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Table 4. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million) – by Type of Construction
Table 5. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million) – by Tier Standard
Table 6. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million) – by Industry Vertical
Table 7. South & Central America: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Country
Table 8. Brazil: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 9. Brazil: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 10. Brazil: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 11. Argentina: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 12. Argentina: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 13. Argentina: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 14. Rest of South & Central America: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 15. Rest of South & Central America: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 16. Rest of South & Central America: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 17. Heat Map Analysis By Key Players

LIST OF FIGURES

Figure 1. South & Central America Data Center Construction Market Segmentation, by Country
Figure 2. Ecosystem Analysis
Figure 3. Impact Analysis of Drivers and Restraints
Figure 4. South & Central America Data Center Construction Market Revenue (US$ Million), 2022-2030
Figure 5. South & Central America Data Center Construction Market Share (%) – by Type of Construction (2022 and 2030)
Figure 6. Electrical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 7. General Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 8. Mechanical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 9. South & Central America Data Center Construction Market Share (%) – by Tier Standard (2022 and 2030)
Figure 10. Tier 3: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 11. Tier 4: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 12. Tier 1 and Tier 2: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 13. South & Central America Data Center Construction Market Share (%) – by Industry Vertical (2022 and 2030)
Figure 14. IT and telecommunication: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 15. BFSI: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 16. Media and Entertainment: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 17. Retail: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 18. Manufacturing: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 19. Government: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 20. Transportation: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 21. Others: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 22. South & Central America Data Center Construction Market- Revenue by Key Countries 2022 (US$ Million)
Figure 23. South & Central America: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 24. Brazil: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 25. Argentina: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 26. Rest of South & Central America: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 27. Company Positioning & Concentration

The List of Companies – South & Central America Data Center Construction Market

o Rittal GmbH & co KG
o Schneider Electric SE
o DPR Construction Inc
o AECOM
o Turner Construction Co
o Eaton Corp Plc