Middle East & Africa Data Center Construction Market Forecast to 2030

Middle East & Africa Data Center Construction Market Forecast to 2030 – Regional Analysis – by Types of Construction (General Construction, Electrical Design, and Mechanical Design), Tier Standards (Tier 1 & Tier 2, Tier 3, and Tier 4), and Industry Verticals (BFSI, Government, Education, Manufacturing, Retail, Transportation, Media & Entertainment, and Others)

Send Enquiry

$2,485$3,885

Description

The Middle East & Africa data center construction market was valued at US$ 13,527.12 million in 2022 and is expected to reach US$ 22,873.56 million by 2030; it is estimated to register at a CAGR of 6.8% from 2022 to 2030.

Rise in Launch of New Edge Data Centers Bolsters Middle East & Africa Data Center Construction Market

The rise in the launch of new edge data centers is a significant driver of the data center market, as it reflects the evolving needs of industries and consumers for faster and more efficient data processing and storage capabilities closer to the point of use. Edge data centers are strategically positioned closer to end-users, enabling faster data transmission and reduced latency, which is crucial for applications such as IoT, autonomous vehicles, augmented reality, and real-time analytics, where even milliseconds of delay can impact performance and user experience. Also, the rollout of 5G networks is driving the need for edge computing infrastructure to support the increased data traffic and low-latency requirements of next-generation applications. Edge data centers play a vital role in processing and storing data at the network edge, optimizing the efficiency of 5G networks. Various industries are leveraging edge computing for a wide range of use cases. For example, in the healthcare sector, edge data centers facilitate remote patient monitoring, predictive maintenance of medical equipment, and real-time analysis of patient data. In retail, edge computing supports personalized marketing, inventory management, and in-store analytics. Further, various companies are launching new edge data centers. The rise in the launch of new edge data centers is the data center market.

Middle East & Africa Data Center Construction Market Overview

The market for data center construction in the Middle East & Africa (MEA) is growing with the rising establishment of numerous companies and the increased penetration of mobile users in the region. The market has recently evolved, and several colocation service providers are considering offering data center services in the region. Green building regulations and environmental goals of energy sustainability are identified as one of the major growth trends regarding data center construction.

The presence of harsh climatic conditions in the MEA is making modular data centers a viable option for companies considering advanced storage systems. Modular data centers are constructed to operate efficiently in harsh climatic conditions, which, in turn, is increasing the adoption rate for these data centers in the Middle East. The energy sector is one of the prominent industrial verticals that has adopted modular data centers due to their remote operational locations and harsh environmental operating conditions. For instance, in November 2023, the Ministry of Communications and Information Technology (MCIT) called for a US$ 18 billion investment in hyperscale data centers and renewable energy by 2030 to boost total capacity to more than 1.3GW and transform Saudi Arabia into the main data center hub across the region. Also, the government is focusing on increasing modular data centers in the region owing to the high efficiency and reduced power consumption of the data centers. Therefore, all these factors support the growth of the data center construction market in the MEA.

Middle East & Africa Data Center Construction Market Revenue and Forecast to 2030 (US$ Million)

Middle East & Africa Data Center Construction Market Segmentation

The Middle East & Africa data center construction market is segmented based on types of construction, tier standards, industry verticals, and country.

Based on types of construction, the Middle East & Africa data center construction market is segmented into general construction, electrical design, and mechanical design. The electrical design segment held the largest share in 2022.

In terms of tier standards, the Middle East & Africa data center construction market is segmented into tier 1 & tier 2, tier 3, and tier 4. The tier 3 segment held the largest share in 2022.

By industry verticals, the Middle East & Africa data center construction market is segmented into IT & telecommunication, BFSI, government, education, manufacturing, retail, transportation, media & entertainment, and others. The IT & telecommunication segment held the largest share in 2022.

Based on country, the Middle East & Africa data center construction market is categorized into South Africa, Saudi Arabia, the UAE, and the Rest of Middle East & Africa. The Rest of Middle East & Africa dominated the Middle East & Africa data center construction market in 2022.

Rittal GmbH & co KG, Schneider Electric SE, AECOM, Turner Construction Co, and Eaton Corp Plc are some of the leading companies operating in the Middle East & Africa data center construction market.

Summary Info

Industry:

Pricing options:

, ,

Geographical coverage:

,

Year of Publication:

At 6.8% CAGR, Middle East & Africa Data Center Construction Market is Speculated to be Worth US$ 22,873.56 Million by 2030, says Business Market Insights

According to Business Market Insights’ research, the Middle East & Africa data center construction market was valued at US$ 13,527.12 million in 2022 and is expected to reach US$ 22,873.56 million by 2030, registering a CAGR of 6.8% from 2022 to 2030. Increasing implementation of hyperscalers and colocation and growing construction of tier 4 data centers are among the critical factors attributed to the Middle East & Africa data center construction market expansion.

A hyperscale is a kind of large-scale data center that offers vast computing capabilities, often in the form of an elastic cloud platform. Organizations use them to manage and deliver extensive applications and services. The objective of hyperscalers is to expand their service offerings while maintaining better latency as well as improve availability in order to cover more ground. They face intense competition from colocation providers in addition to internal competitors. 37% of the capacity of data centers is owned by colocation providers such as Digital Realty, Equinix, CyrusOne, Chindata, and Global Switch; 32% by cloud service providers and hyperscalers; 20% by privately owned data centers; and 11% by telecoms.

Moreover, for small enterprises, constructing their data center involves huge capital. Since these enterprises have a limited budget or capital expenditure to construct a data center, the ROI is comparatively low. As a result, most of these enterprises are choosing colocation or cloud services. These companies do not require much storage space, and constructing their own data center is not feasible. Therefore, they depend on colocation or CSPs to store their data. Also, apart from the capital required to build a data center, other expenses and efforts such as maintenance and service become a burden for these companies. Moreover, the demand for colocation services and hyperscalers is leading to the rise in the construction of mega data centers as they offer economies of scale. Thus, the increasing implementation of hyperscalers and colocation is anticipated to create lucrative opportunities for the Middle East & Africa data center construction market growth during the forecast period.

On the contrary, complexities in data center infrastructure and its establishment hampers the growth of Middle East & Africa data center construction market.

Based on types of construction, the Middle East & Africa data center construction market is segmented into general construction, electrical design, and mechanical design. The electrical design segment held 48.3% share of the Middle East & Africa data center construction market in 2022, amassing US$ 6,534.15 million. It is projected to garner US$ 11,930.55 million by 2030 to expand at 7.8% CAGR during 2022-2030.

In terms of tier standards, the Middle East & Africa data center construction market is segmented into tier 1 & tier 2, tier 3, and tier 4. The tier 3 segment held 48.1% share of the Middle East & Africa data center construction market in 2022, amassing US$ 6,506.05 million. It is estimated to garner US$ 10,794.39 million by 2030 to expand at 6.5% CAGR during 2022-2030.

By industry verticals, the Middle East & Africa data center construction market is segmented into IT & telecommunication, BFSI, government, education, manufacturing, retail, transportation, media & entertainment, and others. The IT & telecommunication segment held 29.9% share of Middle East & Africa data center construction market in 2022, amassing US$ 4,050.40 million. It is predicted to garner US$ 7,545.46 million by 2030 to expand at 8.1% CAGR during 2022-2030.

Based on country, the Middle East & Africa data center construction market is categorized into South Africa, Saudi Arabia, the UAE, and the Rest of Middle East & Africa. The Rest of Middle East & Africa held 44.3% share of Middle East & Africa data center construction market in 2022, amassing US$ 5,997.92 million. It is projected to garner US$ 8,914.36 million by 2030 to expand at 5.1% CAGR during 2022-2030.

Key players operating in the Middle East & Africa data center construction market are Rittal GmbH & co KG, Schneider Electric SE, AECOM, Turner Construction Co, and Eaton Corp Plc, among others.

o Save and reduce time carrying out entry-level research by identifying the growth, size, leading players, and segments in the Middle East & Africa data center construction market.
o Highlights key business priorities in order to assist companies to realign their business strategies.
o The key findings and recommendations highlight crucial progressive industry trends in Middle East & Africa data center construction market, thereby allowing players across the value chain to develop effective long-term strategies.
o Develop/modify business expansion plans by using substantial growth offering developed and emerging markets.
o Scrutinize in-depth Middle East & Africa market trends and outlook coupled with the factors driving the market, as well as those hindering it.
o Enhance the decision-making process by understanding the strategies that underpin security interest with respect to client products, segmentation, pricing, and distribution.
TABLE OF CONTENTS

1. Introduction
1.1 The Research Team Research Report Guidance
1.2 Market Segmentation
2. Executive Summary
2.1 Key Insights
2.2 Market Attractiveness
3. Research Methodology
3.1 Coverage
3.2 Secondary Research
3.3 Primary Research
4. Middle East & Africa Data Center Construction Market Landscape
4.1 Overview
4.2 Ecosystem Analysis
4.2.1 List of Vendors in the Value Chain
5. Middle East & Africa Data Center Construction Market – Key Market Dynamics
5.1 Middle East & Africa Data Center Construction Market – Key Market Dynamics
5.1.1 Rise in Launch of New Edge Data Centers
5.1.2 Rapid Expansion of IoT Services
5.1.3 Surge in Data Center Construction Activities
5.2 Market Restraints
5.2.1 Rise in Cost of Infrastructure Development
5.2.2 Complexities in Data Center Infrastructure and its Establishment
5.3 Market Opportunities
5.3.1 Increasing Implementation of Hyperscalers and Colocation
5.3.2 Growing Construction of Tier 4 Data Centers
5.4 Future Trends
5.4.1 Increasing Adoption of Green Data Centers
5.5 Impact of Drivers and Restraints:
6. Data Center Construction Market – Middle East & Africa Market Analysis
6.1 Middle East & Africa Data Center Construction Market Revenue (US$ Million), 2022-2030
6.2 Middle East & Africa Data Center Construction Market Forecast Analysis
7. Middle East & Africa Data Center Construction Market Analysis – by Type of Construction
7.1 Electrical Construction
7.1.1 Overview
7.1.2 Electrical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
7.2 General Construction
7.2.1 Overview
7.2.2 General Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
7.3 Mechanical Construction
7.3.1 Overview
7.3.2 Mechanical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
8. Middle East & Africa Data Center Construction Market Analysis – by Tier Standard
8.1 Tier 3
8.1.1 Overview
8.1.2 Tier 3: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
8.2 Tier 4
8.2.1 Overview
8.2.2 Tier 4: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
8.3 Tier 1 and Tier 2
8.3.1 Overview
8.3.2 Tier 1 and Tier 2: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9. Middle East & Africa Data Center Construction Market Analysis – by Industry Vertical
9.1 IT and telecommunication
9.1.1 Overview
9.1.2 IT and telecommunication: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.2 BFSI
9.2.1 Overview
9.2.2 BFSI: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.3 Media and Entertainment
9.3.1 Overview
9.3.2 Media and Entertainment: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.4 Retail
9.4.1 Overview
9.4.2 Retail: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.5 Manufacturing
9.5.1 Overview
9.5.2 Manufacturing: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.6 Government
9.6.1 Overview
9.6.2 Government: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.7 Transportation
9.7.1 Overview
9.7.2 Transportation: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.8 Others
9.8.1 Overview
9.8.2 Others: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10. Middle East & Africa Data Center Construction Market -Country Analysis
10.1 Middle East & Africa
10.1.1 Middle East & Africa: Data Center Construction Market – Revenue and Forecast Analysis – by Country
10.1.1.1 Middle East & Africa: Data Center Construction Market – Revenue and Forecast Analysis – by Country
10.1.1.2 Saudi Arabia: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.1.2.1 Saudi Arabia: Data Center Construction Market Breakdown, by Type of Construction
10.1.1.2.2 Saudi Arabia: Data Center Construction Market Breakdown, by Tier Standard
10.1.1.2.3 Saudi Arabia: Data Center Construction Market Breakdown, by Industry Vertical
10.1.1.3 United Arab Emirates: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.1.3.1 United Arab Emirates: Data Center Construction Market Breakdown, by Type of Construction
10.1.1.3.2 United Arab Emirates: Data Center Construction Market Breakdown, by Tier Standard
10.1.1.3.3 United Arab Emirates: Data Center Construction Market Breakdown, by Industry Vertical
10.1.1.4 South Africa: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.1.4.1 South Africa: Data Center Construction Market Breakdown, by Type of Construction
10.1.1.4.2 South Africa: Data Center Construction Market Breakdown, by Tier Standard
10.1.1.4.3 South Africa: Data Center Construction Market Breakdown, by Industry Vertical
10.1.1.5 Rest of Middle East & Africa: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.1.5.1 Rest of Middle East & Africa: Data Center Construction Market Breakdown, by Type of Construction
10.1.1.5.2 Rest of Middle East & Africa: Data Center Construction Market Breakdown, by Tier Standard
10.1.1.5.3 Rest of Middle East & Africa: Data Center Construction Market Breakdown, by Industry Vertical
11. Competitive Landscape
11.1 Heat Map Analysis by Key Players
11.2 Company Positioning & Concentration
12. Industry Landscape
12.1 Overview
12.2 Market Initiative
13. Company Profiles
13.1 Rittal GmbH & Co KG
13.1.1 Key Facts
13.1.2 Business Description
13.1.3 Products and Services
13.1.4 Financial Overview
13.1.5 SWOT Analysis
13.1.6 Key Developments
13.2 Schneider Electric SE
13.2.1 Key Facts
13.2.2 Business Description
13.2.3 Products and Services
13.2.4 Financial Overview
13.2.5 SWOT Analysis
13.2.6 Key Developments
13.3 AECOM
13.3.1 Key Facts
13.3.2 Business Description
13.3.3 Products and Services
13.3.4 Financial Overview
13.3.5 SWOT Analysis
13.3.6 Key Developments
13.4 Turner Construction Co
13.4.1 Key Facts
13.4.2 Business Description
13.4.3 Products and Services
13.4.4 Financial Overview
13.4.5 SWOT Analysis
13.4.6 Key Developments
13.5 Eaton Corp Plc
13.5.1 Key Facts
13.5.2 Business Description
13.5.3 Products and Services
13.5.4 Financial Overview
13.5.5 SWOT Analysis
13.5.6 Key Developments
14. Appendix
14.1 About The Research Team

LIST OF TABLES

Table 1. Middle East & Africa Data Center Construction Market Segmentation
Table 2. List of Vendors
Table 3. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Table 4. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million) – by Type of Construction
Table 5. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million) – by Tier Standard
Table 6. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million) – by Industry Vertical
Table 7. Middle East & Africa: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Country
Table 8. Saudi Arabia: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 9. Saudi Arabia: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 10. Saudi Arabia: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 11. United Arab Emirates: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 12. United Arab Emirates: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 13. United Arab Emirates: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 14. South Africa: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 15. South Africa: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 16. South Africa: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 17. Rest of Middle East & Africa: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 18. Rest of Middle East & Africa: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 19. Rest of Middle East & Africa: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 20. Heat Map Analysis By Key Players

LIST OF FIGURES

Figure 1. Middle East & Africa Data Center Construction Market Segmentation, by Country
Figure 2. Ecosystem Analysis
Figure 3. Impact Analysis of Drivers and Restraints
Figure 4. Middle East & Africa Data Center Construction Market Revenue (US$ Million), 2022-2030
Figure 5. Middle East & Africa Data Center Construction Market Share (%) – by Type of Construction (2022 and 2030)
Figure 6. Electrical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 7. General Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 8. Mechanical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 9. Middle East & Africa Data Center Construction Market Share (%) – by Tier Standard (2022 and 2030)
Figure 10. Tier 3: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 11. Tier 4: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 12. Tier 1 and Tier 2: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 13. Middle East & Africa Data Center Construction Market Share (%) – by Industry Vertical (2022 and 2030)
Figure 14. IT and telecommunication: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 15. BFSI: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 16. Media and Entertainment: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 17. Retail: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 18. Manufacturing: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 19. Government: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 20. Transportation: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 21. Others: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 22. Middle East & Africa Data Center Construction Market- Revenue by Key Countries 2022 (US$ Million)
Figure 23. Middle East & Africa: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 24. Saudi Arabia: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 25. United Arab Emirates: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 26. South Africa: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 27. Rest of Middle East & Africa: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 28. Company Positioning & Concentration

The List of Companies – Middle East & Africa Data Center Construction Market

o Rittal GmbH & co KG
o Schneider Electric SE
o AECOM
o Turner Construction Co
o Eaton Corp Plc

Reviews

There are no reviews yet.

Be the first to review “Middle East & Africa Data Center Construction Market Forecast to 2030”