Europe Data Center Construction Market Forecast to 2030

Europe Data Center Construction Market Forecast to 2030 – Regional Analysis – by Types of Construction (General Construction, Electrical Design, and Mechanical Design), Tier Standards (Tier 1 & Tier 2, Tier 3, and Tier 4), and Industry Verticals (BFSI, Government, Education, Manufacturing, Retail, Transportation, Media & Entertainment, and Others)

Send Enquiry

$2,485$3,885

Description

The Europe data center construction market was valued at US$ 54,813.00 million in 2022 and is expected to reach US$ 96,516.99 million by 2030; it is estimated to register at a CAGR of 7.3% from 2022 to 2030.

Growing Construction of Tier 4 Data Centers Drives Europe Data Center Construction Market

A Tier 4 data center is the highest certification in the Uptime Institute’s system of segmenting data center performance into four tiers. This tier accounts for an expected uptime of 99.995% per year. Tier 4 data centers provide the highest level of uptime and fault tolerance, making them ideal for mission-critical applications such as financial services, healthcare, and telecommunications. As these sectors grow and digitalization continues, the demand for Tier 4 facilities rises, which boosts the number of new construction projects.

Additionally, Tier 4 data centers command premium pricing compared to lower tiers due to their advanced infrastructure and stringent operational requirements. This leads to higher profits for construction companies and data center operators, attracting significant investment for construction of new data centers. The construction of Tier 4 data centers requires expertise from various industries, including electrical and mechanical engineering, construction materials, and specialized IT equipment. This stimulates growth in these related industries, creating additional employment opportunities and economic benefits. Furthermore, companies such as EBRC comprise several tier 4 data centers named Resilience Centre West, CTRLS Datacenters Ltd., Windhof, Resilience Centre South, Kayl, European Reliance Centre East, Betzdorf, and Sunbird Inc. Thus, the growing construction of Tier 4 data centers is expected to present a promising opportunity for the Europe data center construction market growth during the forecast period.

Europe Data Center Construction Market Overview

The data center construction market is experiencing growth due to factors such as the strength of the European economy, the rise in demand for cloud computing, and the increased reliance on digital technologies. The market encompasses various infrastructure types and offerings, including electrical infrastructure, mechanical infrastructure, general infrastructure, solutions, professional services. Several companies are actively involved in the data center construction market in Europe. For instance, in October 2023, Data4, a data center operator based in France, enlisted the services of Hill International to oversee the development of a new campus in San Agustín de Guadalix, Spain. The project, known as MAD2, will span across a 6.5-hectare site and encompass four data centers with a combined capacity of 80 MW. Data4 has emphasized that these new facilities will leverage their efficient and adaptable model to accommodate the growth of their customers. Moreover, in October 2023, Telehouse, an internationally recognized provider of colocation services, declared the commencement of construction for a second data center at its TH3 Paris Magny location in France. The data center will offer a substantial IT floor space measuring 12,000 square meters, along with an electrical power capacity of 18 MW. The company’s decision to expand its infrastructure in this manner aligns with its strategic objective of enhancing European and national digital independence by augmenting hosting and connectivity provisions at its existing regional facilities, thereby attracting global internet traffic to the region. Such developments are expected to boost the data center construction market growth in Europe during the forecast period.

Europe Data Center Construction Market Revenue and Forecast to 2030 (US$ Million)

Europe Data Center Construction Market Segmentation

The Europe data center construction market is segmented based on types of construction , tier standards , industry verticals , and country.

Based on types of construction, the Europe data center construction market is segmented into general construction, electrical design, and mechanical design. The electrical design segment held the largest share in 2022.

In terms of tier standards, the Europe data center construction market is segmented into tier 1 & tier 2, tier 3, and tier 4. The tier 3 segment held the largest share in 2022.

By industry verticals, the Europe data center construction market is segmented into IT & telecommunication, BFSI, government, education, manufacturing, retail, transportation, media & entertainment, and others. The IT & telecommunication segment held the largest share in 2022.

Based on country, the Europe data center construction market is categorized into Germany, France, UK, Sweden, and the Rest of Europe. The Rest of Europe dominated the Europe data center construction market in 2022.

Rittal GmbH & Co KG, Schneider Electric SE, DPR Construction Inc, Mercury Engineering Ltd, STO Building Group Inc, AECOM, Turner Construction Co, and Eaton Corp Plc are some of the leading companies operating in the Europe data center construction market.

Summary Info

Industry:

Pricing options:

, ,

Geographical coverage:

Year of Publication:

At 7.3% CAGR, Europe Data Center Construction Market is Speculated to be Worth US$ 96,516.99 Million by 2030, says Business Market Insights
According to Business Market Insights’ research, the Europe data center construction market was valued at US$ 54,813.00 million in 2022 and is expected to reach US$ 96,516.99 million by 2030, registering a CAGR of 7.3% from 2022 to 2030. Rapid expansion of IOT services and surge in data center construction activities are among the critical factors attributed to the Europe data center construction market expansion.
The IoT has transformed data centers in recent years due to a surge in the adoption of IoT and IoT devices such as lightbulbs, cellphones, and webcams. With the rise in the number of IoT devices, the reliance on data centers to appropriately store, process, and analyze data is also growing. In addition, as more and more devices connect to the internet through IoT, they generate massive amounts of data. These devices include sensors in smart homes, wearables, industrial equipment, and connected cars, among others. The type of data generated by these devices is becoming increasingly diverse and complex. It includes location data, environmental data, usage data, and even real-time video streams. Further, analytics and processes are critical components in a company’s digital transformation. Analytics and processes provide an avenue for data centers to expand their activities in terms of their operations. Their distinct digitization processes will include IoT deployment in operations, capacity building, business development, infrastructure, and system utilization. As more devices connect and generate massive data, the need for efficient and scalable data center infrastructure also increases. Thus, the expansion of IoT services fuels the Europe data center construction market growth.
On the contrary, complexities in data center infrastructure and its establishment hamper the growth of Europe data center construction market.
Based on types of construction, the Europe data center construction market is segmented into general construction, electrical design, and mechanical design. The electrical design segment held 46.7% share of the Europe data center construction market in 2022, amassing US$ 25,601.37 million. It is projected to garner US$ 48,926.30 million by 2030 to expand at 8.4% CAGR during 2022–2030.
In terms of tier standards, the Europe data center construction market is segmented into tier 1 & tier 2, tier 3, and tier 4. The tier 3 segment held 47.0% share of the Europe data center construction market in 2022, amassing US$ 25,763.71 million. It is estimated to garner US$ 44,298.75 million by 2030 to expand at 7.0% CAGR during 2022–2030.
By industry verticals, the Europe data center construction market is segmented into IT & telecommunication, BFSI, government, education, manufacturing, retail, transportation, media & entertainment, and others. The IT & telecommunication segment held 27.5% share of Europe data center construction market in 2022, amassing US$ 15,075.40 million. It is predicted to garner US$ 28,248.22 million by 2030 to expand at 8.2% CAGR during 2022–2030.
Based on country, the Europe data center construction market is categorized into Germany, France, UK, Sweden, and the Rest of Europe. The Rest of Europe held 56.3% share of Europe data center construction market in 2022, amassing US$ 30,876.16 million. It is projected to garner US$ 51,396.97 million by 2030 to expand at 6.6% CAGR during 2022–2030.
Key players operating in the Europe data center construction market are Rittal GmbH & Co KG, Schneider Electric SE, DPR Construction Inc, Mercury Engineering Ltd, STO Building Group Inc, AECOM, Turner Construction Co, and Eaton Corp Plc, among others.

o Save and reduce time carrying out entry-level research by identifying the growth, size, leading players, and segments in the Europe data center construction market.
o Highlights key business priorities in order to assist companies to realign their business strategies.
o The key findings and recommendations highlight crucial progressive industry trends in Europe data center construction market, thereby allowing players across the value chain to develop effective long-term strategies.
o Develop/modify business expansion plans by using substantial growth offering developed and emerging markets.
o Scrutinize in-depth Europe market trends and outlook coupled with the factors driving the market, as well as those hindering it.
o Enhance the decision-making process by understanding the strategies that underpin security interest with respect to client products, segmentation, pricing, and distribution.
TABLE OF CONTENTS

1. Introduction
1.1 The Research Team Research Report Guidance
1.2 Market Segmentation
2. Executive Summary
2.1 Key Insights
2.2 Market Attractiveness
3. Research Methodology
3.1 Coverage
3.2 Secondary Research
3.3 Primary Research
4. Europe Data Center Construction Market Landscape
4.1 Overview
4.2 Ecosystem Analysis
4.2.1 List of Vendors in the Value Chain
5. Europe Data Center Construction Market – Key Market Dynamics
5.1 Europe Data Center Construction Market – Key Market Dynamics
5.1.1 Rise in Launch of New Edge Data Centers
5.1.2 Rapid Expansion of IoT Services
5.1.3 Surge in Data Center Construction Activities
5.2 Market Restraints
5.2.1 Rise in Cost of Infrastructure Development
5.2.2 Complexities in Data Center Infrastructure and its Establishment
5.3 Market Opportunities
5.3.1 Increasing Implementation of Hyperscalers and Colocation
5.3.2 Growing Construction of Tier 4 Data Centers
5.4 Future Trends
5.4.1 Increasing Adoption of Green Data Centers
5.5 Impact of Drivers and Restraints:
6. Data Center Construction Market – Europe Market Analysis
6.1 Europe Data Center Construction Market Revenue (US$ Million), 2022–2030
6.2 Europe Data Center Construction Market Forecast Analysis
7. Europe Data Center Construction Market Analysis – by Type of Construction
7.1 Electrical Construction
7.1.1 Overview
7.1.2 Electrical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
7.2 General Construction
7.2.1 Overview
7.2.2 General Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
7.3 Mechanical Construction
7.3.1 Overview
7.3.2 Mechanical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
8. Europe Data Center Construction Market Analysis – by Tier Standard
8.1 Tier 3
8.1.1 Overview
8.1.2 Tier 3: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
8.2 Tier 4
8.2.1 Overview
8.2.2 Tier 4: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
8.3 Tier 1 and Tier 2
8.3.1 Overview
8.3.2 Tier 1 and Tier 2: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9. Europe Data Center Construction Market Analysis – by Industry Vertical
9.1 IT and telecommunication
9.1.1 Overview
9.1.2 IT and telecommunication: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.2 BFSI
9.2.1 Overview
9.2.2 BFSI: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.3 Media and Entertainment
9.3.1 Overview
9.3.2 Media and Entertainment: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.4 Retail
9.4.1 Overview
9.4.2 Retail: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.5 Manufacturing
9.5.1 Overview
9.5.2 Manufacturing: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.6 Government
9.6.1 Overview
9.6.2 Government: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.7 Transportation
9.7.1 Overview
9.7.2 Transportation: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
9.8 Others
9.8.1 Overview
9.8.2 Others: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10. Europe Data Center Construction Market –Country Analysis
10.1 Europe
10.1.1 Europe: Data Center Construction Market – Revenue and Forecast Analysis – by Country
10.1.1.1 Europe: Data Center Construction Market – Revenue and Forecast Analysis – by Country
10.1.1.2 Germany: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.1.2.1 Germany: Data Center Construction Market Breakdown, by Type Of Construction
10.1.1.2.2 Germany: Data Center Construction Market Breakdown, by Tier Standard
10.1.1.2.3 Germany: Data Center Construction Market Breakdown, by Industry Vertical
10.1.1.3 United Kingdom: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.1.3.1 United Kingdom: Data Center Construction Market Breakdown, by Type Of Construction
10.1.1.3.2 United Kingdom: Data Center Construction Market Breakdown, by Tier Standard
10.1.1.3.3 United Kingdom: Data Center Construction Market Breakdown, by Industry Vertical
10.1.1.4 France: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.1.4.1 France: Data Center Construction Market Breakdown, by Type Of Construction
10.1.1.4.2 France: Data Center Construction Market Breakdown, by Tier Standard
10.1.1.4.3 France: Data Center Construction Market Breakdown, by Industry Vertical
10.1.1.5 Sweden: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.1.5.1 Sweden: Data Center Construction Market Breakdown, by Type Of Construction
10.1.1.5.2 Sweden: Data Center Construction Market Breakdown, by Tier Standard
10.1.1.5.3 Sweden: Data Center Construction Market Breakdown, by Industry Vertical
10.1.1.6 Rest of Europe: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
10.1.1.6.1 Rest of Europe: Data Center Construction Market Breakdown, by Type Of Construction
10.1.1.6.2 Rest of Europe: Data Center Construction Market Breakdown, by Tier Standard
10.1.1.6.3 Rest of Europe: Data Center Construction Market Breakdown, by Industry Vertical
11. Competitive Landscape
11.1 Heat Map Analysis by Key Players
11.2 Company Positioning & Concentration
12. Industry Landscape
12.1 Overview
12.2 Market Initiative
13. Company Profiles
13.1 Rittal GmbH & Co KG
13.1.1 Key Facts
13.1.2 Business Description
13.1.3 Products and Services
13.1.4 Financial Overview
13.1.5 SWOT Analysis
13.1.6 Key Developments
13.2 Schneider Electric SE
13.2.1 Key Facts
13.2.2 Business Description
13.2.3 Products and Services
13.2.4 Financial Overview
13.2.5 SWOT Analysis
13.2.6 Key Developments
13.3 DPR Construction Inc
13.3.1 Key Facts
13.3.2 Business Description
13.3.3 Products and Services
13.3.4 Financial Overview
13.3.5 SWOT Analysis
13.3.6 Key Developments
13.4 Mercury Engineering Ltd
13.4.1 Key Facts
13.4.2 Business Description
13.4.3 Products and Services
13.4.4 Financial Overview
13.4.5 SWOT Analysis
13.4.6 Key Developments
13.5 STO Building Group Inc
13.5.1 Key Facts
13.5.2 Business Description
13.5.3 Products and Services
13.5.4 Financial Overview
13.5.5 SWOT Analysis
13.5.6 Key Developments
13.6 AECOM
13.6.1 Key Facts
13.6.2 Business Description
13.6.3 Products and Services
13.6.4 Financial Overview
13.6.5 SWOT Analysis
13.6.6 Key Developments
13.7 Turner Construction Co
13.7.1 1.8.1 Key Facts
13.7.2 Business Description
13.7.3 Products and Services
13.7.4 Financial Overview
13.7.5 SWOT Analysis
13.7.6 Key Developments
13.8 Eaton Corp Plc
13.8.1 Key Facts
13.8.2 Business Description
13.8.3 Products and Services
13.8.4 Financial Overview
13.8.5 SWOT Analysis
13.8.6 Key Developments
14. Appendix
14.1 About The Research Team

LIST OF TABLES

Table 1. Europe Data Center Construction Market Segmentation
Table 2. List of Vendors
Table 3. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Table 4. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million) – by Type of Construction
Table 5. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million) – by Tier Standard
Table 6. Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million) – by Industry Vertical
Table 7. Europe: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Country
Table 8. Germany: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 9. Germany: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 10. Germany: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 11. United Kingdom: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 12. United Kingdom: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 13. United Kingdom: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 14. France: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 15. France: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 16. France: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 17. Sweden: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 18. Sweden: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 19. Sweden: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 20. Rest of Europe: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Type Of Construction
Table 21. Rest of Europe: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Tier Standard
Table 22. Rest of Europe: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million) – by Industry Vertical
Table 23. Heat Map Analysis By Key Players

LIST OF FIGURES

Figure 1. Europe Data Center Construction Market Segmentation, by Country
Figure 2. Ecosystem Analysis
Figure 3. Impact Analysis of Drivers and Restraints
Figure 4. Europe Data Center Construction Market Revenue (US$ Million), 2022–2030
Figure 5. Europe Data Center Construction Market Share (%) – by Type of Construction (2022 and 2030)
Figure 6. Electrical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 7. General Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 8. Mechanical Construction: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 9. Europe Data Center Construction Market Share (%) – by Tier Standard (2022 and 2030)
Figure 10. Tier 3: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 11. Tier 4: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 12. Tier 1 and Tier 2: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 13. Europe Data Center Construction Market Share (%) – by Industry Vertical (2022 and 2030)
Figure 14. IT and telecommunication: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 15. BFSI: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 16. Media and Entertainment: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 17. Retail: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 18. Manufacturing: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 19. Government: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 20. Transportation: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 21. Others: Data Center Construction Market – Revenue and Forecast to 2030 (US$ Million)
Figure 22. Europe Data Center Construction Market– Revenue by Key Countries 2022 (US$ Million)
Figure 23. Europe: Data Center Construction Market Breakdown, by Key Countries, 2022 and 2030 (%)
Figure 24. Germany: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 25. United Kingdom: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 26. France: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 27. Sweden: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 28. Rest of Europe: Data Center Construction Market – Revenue and Forecast to 2030(US$ Million)
Figure 29. Company Positioning & Concentration

The List of Companies – Europe Data Center Construction Market

o Rittal GmbH & co KG
o Schneider Electric SE
o DPR Construction Inc
o Mercury Engineering Ltd
o STO Building Group Inc
o AECOM
o Turner Construction Co
o Eaton Corp Plc

Reviews

There are no reviews yet.

Be the first to review “Europe Data Center Construction Market Forecast to 2030”